Need a plan quote or proposal? Available for free 24/7!
Contact: +8619914754015 (WeChat/WhatsApp)
Submit your inquiry for a tailored solution.
{{ variable.name }} : {{ variable.values[selectedVariantsIndex[variable_index]].name }}
The gold gravity separation process (for hard rock coarse gold recovery) utilizes the density difference between gold and gangue to recover coarse free gold early in the grinding circuit, preventing it from being over-ground and lost as slimes. In hard rock gold processing plants, gravity separation typically does not constitute a complete standalone process; instead, it is embedded within the grinding circuit or combined with flotation or cyanidation, following the "recover as early as possible" principle. With the same jig machine or Knelson concentrator, if the grind size and equipment placement are incorrect, the coarse gold will still report to the tailings. This article breaks down the hard rock gold gravity separation line from process principles, core steps, parameter control, equipment configuration, and selection logic, helping you see the plant route, equipment list, and budget clearly before building or upgrading a plant.
Gravity separation in hard rock gold processing is a physical beneficiation method that separates gold from gangue minerals based on their density difference. The density of gold is approximately 19.3 g/cm³, while gangue is only 2.6-2.8 g/cm³. Gold particles settle faster, thus separating from lighter minerals. In hard rock gold processing, gravity separation does not usually constitute a complete standalone process; it is either embedded in the grinding circuit to recover coarse free gold or used as a pre-concentration stage before flotation/cyanidation, following the "recover as early as possible" principle—capturing already liberated coarse gold after the ore enters the ball mill but before it is over-ground, avoiding loss of flattened, slimed, or fine gold to the tailings.
A complete hard rock gold gravity separation line typically includes: crushing → grinding & classification (with embedded gravity section) → jig / Knelson concentrator roughing → shaking table cleaning → gravity concentrate smelting or sale. The equipment placement and parameter configuration at each stage of the gold gravity separation plant directly determine the final coarse gold recovery rate and the load on subsequent flotation/cyanidation. The reason gravity separation is widespread in hard rock processing plants is that it physically pre-captures high-value coarse gold without consuming reagents, causing minimal interference to downstream processes, making it one of the most economical ways to improve overall gold recovery.

Gold Gravity Separation Line - Jaw Crusher

Gold Gravity Separation Line - Crushing System
Whether a gold gravity separation plant can be realized ultimately depends on the process design and equipment manufacturing capabilities behind it. GoldProcessingPlant is a full-process service provider for gold mining, integrating process design, engineering design, equipment manufacturing, installation, and commissioning. We have two proprietary manufacturing bases and technical teams in Shandong and Jiangxi, China.
GoldProcessingPlant strictly implements the ISO9001 quality management system. Our products are CE certified, with an annual production capacity of over 500 sets. The team consists of gold beneficiation engineers, metallurgical experts, mechanical designers, and a project management team. Core members have over 20 years of industry experience and have participated in multiple large-scale gold mining EPC projects.
The gold gravity separation plant in hard rock mining is mainly aimed at ores containing coarse free gold. The following three scenarios are the core applicable objects for a gravity section:
Process positioning note: In hard rock mining, gravity separation is mostly used as an auxiliary process, embedded in the grinding circuit or combined with flotation/cyanidation, rather than replacing the main process. For ores where gold is mainly in fine-grained encapsulated form without coarse free gold, the value of using gravity separation alone is limited, and it needs to be combined with flotation or cyanidation. When ore properties vary greatly, it is recommended to confirm the position and configuration of the gravity section based on ore sample data.

Gold Gravity Separation Line - Cone Crusher
The gold gravity separation process is divided into five stages. Below is a step-by-step breakdown of the function, equipment, and control points of each stage for hard rock coarse gold recovery, which is also the basis for subsequent gravity equipment selection and investment estimation.

Gold Gravity Separation Line - Ball Mill

Gold Gravity Separation Plant - Ball Mill

Gold Gravity Separation Line - Gold Pan Mill
The stable operation of the gold gravity separation plant relies on the precise control of several key parameters. Below are the core control points for process design and on-site operation in hard rock coarse gold recovery:
The parameters of the gold gravity separation plant are matched to ore properties and coarse gold distribution—if the grind size changes, the gravity section location and equipment parameters must be adjusted accordingly; if the coarse gold size distribution changes, the division of labor between the jig and centrifuge must be re-matched.
The gold gravity separation plant is widely used in hard rock processing plants, with technical advantages concentrated in the following aspects:
Note on Recovery Rates: The coarse gold recovery rate of a gold gravity separation plant is determined by gold particle distribution, liberation degree, equipment placement, and parameter configuration. GoldProcessingPlant does not promise absolute figures detached from reality. What we promise is: through rigorous process design, we will design the highest coarse gold recovery process achievable under your ore conditions, and strive for excellence in equipment selection and process control.

Gold Gravity Separation Line - Jig Machine

Gold Gravity Separation Plant - Jig Machine
The equipment configuration of the gold gravity separation plant is divided into five major systems according to the process stages. Below is a reference for the standard configuration for hard rock coarse gold recovery. Actual selection needs to be adjusted according to capacity and ore characteristics:
| System | Core Equipment | Function Description |
|---|---|---|
| Crushing | Jaw crusher, hydraulic cone crusher | Primary + secondary/fine crushing, more crushing less grinding to reduce mill load |
| Grinding & Classification | Grid/overflow ball mill, hydrocyclone/spiral classifier | Closed-circuit grinding, providing suitable feed size for the gravity section |
| Roughing | Sawtooth wave jig, Knelson concentrator | Core of the gold gravity separation plant; jig captures coarse gold, centrifuge captures fine gold, recover as early as possible |
| Cleaning | 6-S shaking table, multi-deck hanging table | Cleaning and purification to obtain high-grade gravity gold concentrate |
| Smelting/Sale | Medium-frequency smelting furnace, gold ingot casting mold | Smelting and casting of gravity concentrate, or sale as high-grade concentrate |
Equipment Supply Note: All the above gravity equipment is manufactured in-house by GoldProcessingPlant, covering the entire process from jigs, Knelson concentrators, shaking tables, ball mills, to classification equipment. We sell single units or complete sets, configured according to ore characteristics and process requirements, not by inventory. For special working conditions (extreme cold, high altitude, highly corrosive, unstable power in Africa), non-standard customization of materials, motor power, and structure is available.
The equipment investment for a gold gravity separation plant is directly related to the processing capacity, coarse gold size distribution, grind size requirements, gravity section location (jig/Knelson concentrator configuration), shaking table cleaning configuration, and whether it is combined with flotation/cyanidation. For the same hard rock gravity project, ores with high and low coarse gold content will have very different gravity equipment specifications and stage configurations, resulting in significant differences in equipment configuration and investment.
GoldProcessingPlant does not offer a "one-size-fits-all price" detached from ore characteristics; we quote based on actual configuration selection. Tell GoldProcessingPlant your daily processing capacity, ore type, coarse gold distribution, and site conditions, and we can directly issue an equipment configuration list and quotation for the corresponding capacity, making it easy for you to quickly compare investments.
The main variables affecting the investment of a gold gravity separation plant include: processing capacity scale, coarse gold size distribution and liberation degree, grind size and gravity section location, configuration ratio of jigs to Knelson concentrators, scale of the shaking table cleaning section, and interface conditions for combining with flotation/cyanidation. A quotation based on actual configuration is the only one with reference value.

Gold Gravity Separation Line - Centrifugal Concentrator

Gold Gravity Separation Plant - Centrifugal Concentrator
Gold processing is not short of equipment; what it lacks is a team that understands the ore, the process, the equipment, and how to mesh all three together. In hard rock gravity separation projects, GoldProcessingPlant stands out in the following ways:
All gold gravity separation plant schemes are derived based on ore characteristics, not copied from peers' drawings. Different coarse gold size distributions require completely different stage configurations for jigs and Knelson concentrators.
Jigs, Knelson concentrators, shaking tables, and ball mills are all manufactured in-house. Process and mechanical engineers collaborate in the same team; gravity equipment is manufactured strictly according to process drawings, avoiding "drawings not matching equipment."
Gravity separation is not an isolated section; it is embedded in the grinding circuit or connected with flotation/cyanidation. We design both gravity and flotation/cyanidation processes, ensuring interface design is not disconnected.
Under EPC mode, process design, equipment manufacturing, installation guidance, and commissioning training are managed by us end-to-end; civil works and general installation workers are organized locally by the customer, with our engineers providing technical guidance.
Projects cover Africa, South America, Central Asia, and Southeast Asia, with capacities of 30-5000 TPD. For unstable power in Africa, we equip diesel generators; for limited local worker skills, we provide hands-on training.
Commissioning and reaching design capacity are just the beginning. We provide systematic training to ensure your team can independently adjust jig stroke, centrifuge G-force, and shaking table parameters, and provide long-term spare parts and process optimization support.
In addition to the gold gravity separation plant, GoldProcessingPlant's solution library covers hard rock, placer, refractory ore, and tailings retreatment. We can match experience for similar scenarios based on your ore type:
Gold Gravity Separation Line - Shaking Table

Gold Gravity Separation Plant - Shaking Table
GoldProcessingPlant provides EPC turnkey services for gold gravity separation projects: from process design, engineering drawings, and core equipment manufacturing to on-site installation guidance, linkage commissioning, and personnel training, we coordinate and manage it all. The customer only needs to interface with one team. However, mineral processing engineering involves civil works, equipment, installation, and commissioning. Different stages have completely different requirements for qualifications, labor costs, and site conditions. If "who does what" is not clarified before signing the contract, it is very easy to encounter disputes later such as "stopping work waiting for workers" or "passing the buck and demanding extra money."
Therefore, the core principle of GoldProcessingPlant's EPC service is: what we are responsible for, we manage end-to-end; what the customer needs to cooperate with, we clarify in advance. Here are the boundaries listed item by item.
Why is this division of labor more cost-effective? If we send a large number of Chinese workers to overseas or remote sites for construction, the cost of airfare, visas, accommodation, and high daily wages is extremely staggering. The customer recruits ordinary installation workers locally, and we provide technical engineers for guidance, saving at least half of the labor cost. Moreover, local workers communicate conveniently and adapt more flexibly to the on-site civil works progress, without delaying the schedule due to waiting for visas and flights.
If the customer really cannot find a construction team locally, or hopes that GoldProcessingPlant will also take responsibility for civil works and installation workers, this can be discussed separately based on the actual situation of the project location, with the scope separately agreed in the contract and costs calculated.

Gold Gravity Separation Line - Gold Sluice




With the same jig or Knelson concentrator, if the grind size and equipment placement are incorrect, the coarse gold will still report to the tailings. The core of the gold gravity separation process is to mesh grind size, gravity section location, jig stroke, centrifuge G-force, and shaking table parameters with the gravity equipment—if grinding is too coarse, gold is not liberated, and gravity cannot capture it; if grinding is too fine, gold is slimed, and gravity cannot recover it; if the stage is misplaced, coarse gold is crushed in the mill, and no amount of adjustment later can make up for it.
GoldProcessingPlant's logic for gold gravity separation projects is straightforward: understand the ore first, then configure equipment. Tell GoldProcessingPlant your daily capacity, ore type, and coarse gold distribution, and we can directly issue an equipment configuration list and quotation for the corresponding capacity, making it easy for you to quickly compare investments. From ore data to final production, a conventional gold gravity separation line takes 8-15 months; equipment can be selected as single units, complete sets, or EPC as needed, and the early process design fee can be deducted in subsequent cooperation.
If you are evaluating the feasibility of a gold gravity separation plant, or if your existing hard rock processing plant has severe coarse gold loss and high tailings grade, you are welcome to communicate with the GoldProcessingPlant engineering team. Tell us your ore type, processing capacity, and coarse gold distribution, and we will combine project experience to match the gravity process route, equipment configuration, and investment estimate for you.
GoldProcessingPlant provides customized gold gravity separation plant solutions for gold mining customers worldwide. Single equipment, complete sets, engineering drawings, installation and commissioning guidance, EPC turnkey—combine as needed, no mandatory bundling.
Contact us and tell us your daily capacity, ore type, and coarse gold distribution. The GoldProcessingPlant team will issue a configuration quotation with a gold gravity separation equipment list and budget for you.
GoldProcessingPlant works with you to create greater value from every ton of gold ore.
To find out more about our products and solutions, please fill out the form below and one of our experts will get back to you shortly.