Need a plan quote or proposal? Available for free 24/7!
Contact: +8619914754015 (WeChat/WhatsApp)
Submit your inquiry for a tailored solution.
{{ variable.name }} : {{ variable.values[selectedVariantsIndex[variable_index]].name }}
Gold heap leaching is a mainstream gold extraction process for low-grade oxide ore: ore is crushed and stacked on a lined pad, cyanide solution is sprayed over the heap, and the gold-bearing pregnant solution is collected from the base for gold recovery. On the same heap pad, a difference in ore particle size and permeability can translate into a wide gap in leach cycle and recovery — and that difference comes down to how the heap is built, how the solution is applied, and whether the ore is agglomerated to match its characteristics. This guide walks through the process principle, core operations, parameter control, equipment configuration, and investment breakdown of a gold heap leaching plant, so you can see the process route, heap leach equipment list, and budget in one pass before building or upgrading.
Heap leaching is a gold extraction method in which low-grade ore is crushed to a target particle size and stacked, leaching solution (cyanide solution) is sprayed over the impermeable pad, the solution percolates through the heap and dissolves gold, and the gold-bearing pregnant solution is collected from the heap base for downstream recovery. Leaching relies on convective and molecular diffusion through the thin film of solution on the ore surface. The process is simple and low-cost, and suits low-grade oxide gold ore, open-pit waste rock, old tailings, and small remote deposits. Gold recovery is lower than with agitated leaching, but capital cost is low and operation is simple — which is why heap leaching is the mainstream route for economically recovering low-grade gold resources.
A complete gold heap leaching plant includes: ore crushing (or no crushing) → heap construction on an impermeable pad → cyanide solution spraying → pregnant solution collection → activated carbon adsorption columns / zinc precipitation → loaded carbon processing or gold sludge smelting → tailings neutralization and environmental treatment. Every step‘s process parameters and heap leach equipment configuration directly determine the final gold recovery rate and operating cost. The reason heap leaching is so widely adopted for low-grade oxide ore is that it links mining, crushing, leaching, and recovery into one simple production flow, with a low investment threshold that suits scattered deposits and small-to-medium projects.

Gold heap leaching plant process - jaw crusher
Whether a gold heap leaching process can be delivered on the ground ultimately depends on the process design and equipment manufacturing capability behind it. GoldProcessingPlant is a full-process gold mining service provider integrating process design, engineering design, equipment manufacturing, installation, and commissioning, with two self-owned manufacturing bases and technical teams in Shandong and Jiangxi, China.
GoldProcessingPlant strictly follows the ISO9001 quality management system, and its products are CE certified, with an annual production capacity of more than 500 sets. The team consists of gold processing engineers, metallurgical experts, mechanical designers, and a project management team, with core members holding 20+ years of industry experience and having participated in multiple large-scale gold EPC projects.
The gold heap leaching process is matched to ore properties. The following four ore types are typical candidates for heap leaching:
Selection note: Heap leaching is not suitable for sulfide ore, carbonaceous ore, or finely disseminated ore. Sulfide ore consumes high cyanide and gives low recovery; carbonaceous ore “preg-robs” gold, with dissolved gold re-adsorbed onto carbonaceous matter; finely disseminated ore locks gold in gangue, so the solution cannot penetrate. When ore properties vary widely, confirm the process route with assay data to avoid misselection.

Gold heap leaching plant process - cone crusher
The gold heap leaching process is divided into six stages. Below is a stage-by-stage breakdown of what each operation does, the equipment involved, and the control points — the basis for subsequent heap leach equipment selection and cost estimation.

Gold heap leaching plant process flow
Stable operation of a gold heap leaching process depends on precise control of a handful of key parameters. Below are the core control points for heap leach process design and on-site operation:
Gold heap leaching parameters are matched to ore properties and leaching requirements — change the particle size and the leach cycle must follow; raise the clay content and agglomeration and spray intensity must be re-matched.
The gold heap leaching process is widely used for low-grade oxide ore and scattered deposits. Its technical advantages concentrate in the following areas:
A note on recovery rates: Gold recovery in heap leaching is determined jointly by the ore‘s inherent characteristics (dissemination size, permeability, occurrence state) and the heap leach conditions. GoldProcessingPlant does not promise absolute figures detached from reality. What we commit to is this: through rigorous process design, we will design a flow that achieves a reasonable recovery rate for your ore‘s conditions, and we will pursue excellence in equipment selection and heap leach control.

Gold heap leaching process - activated carbon columns and zinc precipitation unit
Gold heap leaching process equipment is configured across six systems by operation. The following is a reference list for a standard heap leach plant; actual selection must be adjusted to throughput and ore characteristics:
| System | Core Equipment | Function |
|---|---|---|
| Crushing | Jaw crusher, cone crusher (optional) | Primary + secondary/tertiary crushing to heap leach particle size |
| Heap construction | Heap pad liner (HDPE membrane), agglomeration equipment (optional) | Impermeable liner; agglomeration for high-clay ore to improve permeability |
| Spraying | Spray pipes, emitters, pump sets | Uniform cyanide solution application; distribution uniformity is key |
| Pregnant solution collection | Pregnant pond, impermeable liner, solution circulation system | Collect gold-bearing pregnant solution; return barren solution to spray circuit |
| Gold recovery | Activated carbon columns / zinc precipitation unit | Core of the gold heap leaching process; recover gold from pregnant solution |
| Loaded carbon / gold sludge processing | Desorption and electrowinning system, smelting furnace | Desorb and electrowin loaded carbon, or smelt gold sludge, to produce doré gold |
| Tailings environmental treatment | Neutralization system, cyanide-bearing wastewater treatment system | Tailings neutralization; cyanide wastewater treated to compliance |
Heap leach equipment supply note: All the heap leach equipment above is either self-manufactured or coordinated by GoldProcessingPlant, covering the full flow from crushing, heap construction, spraying, and gold recovery to loaded carbon processing and tailings environmental treatment. Single units or complete sets, configured to ore properties and process requirements — not to inventory. For special conditions (extreme cold, high altitude, severe corrosion, unstable power in Africa, difficult power supply in remote areas), non-standard customization of materials, motor power, and structure is available.
Equipment investment in a gold heap leaching plant is directly tied to throughput, ore particle size requirements, heap pad liner area, spray system configuration, gold recovery method (activated carbon columns or zinc precipitation), and tailings neutralization and cyanide wastewater treatment. Two heap leach projects of the same size can differ widely in pad liner and agglomeration configuration if one handles simple oxide ore and the other handles high-clay oxide ore — and equipment configuration and investment can diverge just as widely.
GoldProcessingPlant does not quote a “one-price-fits-all” figure detached from ore properties; we quote to the actual configuration. Tell GoldProcessingPlant your daily throughput, ore type, feed size, and site conditions, and we can directly issue an equipment configuration list and quotation for that throughput, making investment comparison fast and straightforward.
The main variables affecting gold heap leach plant investment include: throughput scale, ore particle size requirements, heap pad liner area and impermeability standard, agglomeration configuration (for high-clay ore), spray system and gold recovery method, tailings neutralization and cyanide wastewater treatment, and civil works and power infrastructure conditions. A quotation based on actual configuration is the only one worth comparing.

Gold heap leaching process
Gold processing is not short of equipment; what it lacks is a team that understands ore, understands process, understands equipment, and can mesh all three together. On heap leach gold projects, what sets GoldProcessingPlant apart is:
Every gold heap leaching process scheme is derived from ore properties, not copied from peer drawings. Oxide ore versus clay-rich ore, coarse versus fine — crushing size and spray regime are completely different.
Crushers, activated carbon columns, zinc precipitation units, and desorption-electrowinning systems are all self-manufactured. Process and mechanical engineers work in the same team, and heap leach equipment is built strictly to process drawings — avoiding “drawings and equipment don‘t match”.
Is your ore oxide or clay-rich, how coarse is the particle size, how good is the permeability — every equipment selection decision in the gold heap leaching process has an ore-property basis.
Under EPC, process design, equipment manufacturing, installation guidance, and commissioning training are handled by us to the end; civil works and general installation labor are organized locally by the customer, with our engineers providing technical guidance.
Projects cover Africa, South America, Central Asia, and Southeast Asia, with capacities of 30–5000 TPD. For unstable power in Africa, we add diesel generator sets; where local worker skill is limited, we train hands-on.
Commissioning and reaching design capacity is only the beginning. We provide systematic training to ensure your team can independently adjust spray regime, cyanide concentration, and leach cycle, and we provide long-term spare parts and process optimization support.
GoldProcessingPlant‘s heap leach equipment and solutions have been delivered to gold-producing regions across Africa, South America, Central Asia, and Southeast Asia, with project capacities from 30 TPD to 5000 TPD and ore types ranging from simple oxide ore to high-clay oxide ore.
Complete plant solutions delivered, covering hard rock gold, placer gold, and refractory ore, with diesel generator packages for unstable local power.
Multiple hard rock gold plant projects, with capacities from small to large, ore types mainly oxide and sulfide-hosted gold.
Large placer gold plant construction, adapted to extreme cold, with equipment materials and motor power customized for low-temperature environments.
Covering quartz vein and altered rock gold, plus tailings reprocessing projects, with gravity, flotation, cyanidation, or combined processes matched to occurrence state.
For your specific ore type and region, GoldProcessingPlant can reference the process approach of similar cases during discussion — but the final scheme is based on your actual ore samples and site conditions, never a copy of another project‘s existing drawings.

Gold heap leaching plant equipment - vibrating screen
A gold heap leaching plant typically goes through eight stages from ore data to final gold pour. Understanding what happens at each stage and what the customer needs to provide helps with advance planning and avoids detours.
| Stage | Core Work | Customer Cooperation |
|---|---|---|
| Needs communication and preliminary assessment | Understand ore type, grade, throughput, site conditions; preliminary feasibility assessment | Provide basic mine data or assay results |
| Process design and equipment selection quotation | Determine heap leach process route and heap pad design; issue equipment list, selection scheme, and budget quotation | Confirm site conditions; provide process and target requirements |
| Scheme confirmation and commercial contract | Confirm flowsheet, equipment, heap pad liner, delivery boundary, schedule, and responsibility split | Confirm final scheme and budget |
| Engineering drawing design | Heap layout, equipment foundation, spray piping, pregnant pond liner, civil works condition drawings | Confirm site boundary conditions; coordinate with civil contractor |
| Equipment manufacturing and supply | Production of crushers, activated carbon columns / zinc precipitation units, desorption-electrowinning systems; auxiliary procurement and factory testing | Pay progress payments; advance site “three connections and one leveling” and liner construction |
| Logistics and shipping | Packing, shipping, sea/land transport, documentation and customs clearance, milestone tracking | Provide receiving information; assist customs clearance; arrange unloading and warehousing |
| On-site construction guidance and commissioning | Guide heap pad liner installation, spray system installation, single-machine commissioning, and loaded linked trial run; optimize spray regime and leach cycle | Organize civil works and local installation workers; provide lifting and commissioning conditions |
| Personnel training and after-sales support | Operator training, acceptance handover, spare parts supply, long-term technical support | Arrange operations and maintenance personnel to participate throughout |
A typical gold heap leaching project takes about 8–15 months from process design to final commissioning. Because the leach cycle itself is long, the time to reach design capacity after commissioning must be calculated separately according to the heap leach cycle. Key milestones: process design 7–15 days → engineering design 20–30 days → equipment manufacturing 60–120 days → logistics 30–60 days → installation and commissioning 60–150 days. Reasonable overlap between stages can compress the total schedule; overseas projects need extra customs clearance buffer.
GoldProcessingPlant provides EPC turnkey service for gold heap leaching projects: from process design, engineering drawings, and core equipment manufacturing to on-site installation guidance, linked commissioning, and personnel training, all coordinated by us — the customer deals with one team. But a heap leach project involves heap pad civil works, liner installation, equipment, installation, and commissioning, and different stages have completely different requirements for qualifications, labor cost, and site conditions. If “who does what” is not spelled out before the contract is signed, disputes over “waiting for workers” and “passing the buck with extra charges” are almost inevitable later.
So GoldProcessingPlant‘s EPC service follows a core principle: what we are responsible for, we see through to the end; what the customer needs to cooperate on, we clarify in advance. The boundary is laid out item by item below.
Why is this division more cost-effective? If we sent a large number of Chinese workers overseas or to another site, the cost of flights, visas, accommodation, and high daily wages would be staggering. The customer recruits ordinary installation workers locally, and we provide technical engineers for guidance — saving at least half the labor cost. Local workers also communicate more easily and can flexibly follow the on-site civil works schedule, avoiding delays from waiting for visas or flights.
If the customer genuinely cannot find a construction team locally, or wants GoldProcessingPlant to take on civil works and installation labor as well, this can be discussed separately based on the actual project location, with the scope and cost agreed separately in the contract.

Gold heap leaching project site
Beyond the gold heap leaching process, GoldProcessingPlant‘s solution library covers hard rock gold, placer gold, refractory ore, and tailings reprocessing, so we can match experience from similar scenarios to your ore type:

On the same heap pad, a difference in ore particle size and permeability can translate into a wide gap in leach cycle and recovery — and that difference comes down to how the heap is built, how the solution is applied, and whether the ore is agglomerated to match its characteristics. The core of the gold heap leaching process is meshing particle size, heap permeability, pH, spray intensity, cyanide concentration, and leach cycle with the heap leach equipment — particle size determines permeability, distribution uniformity determines recovery, and liner impermeability determines environmental compliance. Every step is linked.
GoldProcessingPlant‘s logic for heap leach projects is simple: understand the ore first, then configure the equipment. Tell GoldProcessingPlant your daily throughput, ore type, and site conditions, and we can directly issue an equipment configuration list and quotation for that throughput, making investment comparison fast. From ore data to final commissioning, a typical gold heap leaching plant takes 8–15 months; single units, complete sets, and EPC are available as needed, and the upfront process design fee is deductible in subsequent cooperation.
If you are evaluating the feasibility of a gold heap leaching process, or your existing heap leach plant has recovery that won‘t come up or tailings grade that runs high, talk to the GoldProcessingPlant engineering team. Tell us your ore type, throughput, and site conditions, and we will match the heap leach process route, equipment configuration, and investment estimate based on project experience.
GoldProcessingPlant provides customized gold heap leaching process solutions to gold mining customers worldwide — single equipment, complete sets, engineering drawings, installation and commissioning guidance, and EPC turnkey, combined as needed, with no mandatory bundling.
Contact us and tell us your daily throughput, ore type, and site conditions; the GoldProcessingPlant team will issue a configuration quotation with a heap leach equipment list and budget for you.
GoldProcessingPlant — together with you, to create greater value from every ton of gold ore.
To find out more about our products and solutions, please fill out the form below and one of our experts will get back to you shortly.