The gold CIL processing plant (Carbon-in-Leach) is a mainstream gold extraction route in which cyanide leaching and activated carbon adsorption take place in the same tank. On the same leach tank, performance on oxide ore and arsenic-bearing ore can differ widely — the difference lies in whether the leach-adsorption rhythm matches the ore characteristics. This guide breaks down the carbon-in-leach gold processing line from process principle, core operations and parameter control to CIL equipment configuration and investment structure, so you can see the gold CIL process route, equipment list and budget in one pass before building or upgrading.
Carbon-in-Leach (CIL) is a gold extraction process in which leaching and activated carbon adsorption proceed simultaneously. Pulp enters the leach tank, cyanide dissolves gold, and activated carbon in the same tank directly adsorbs the dissolved gold-cyanide complex — leaching and adsorbing at the same time. Loaded carbon is then desorbed, electrowon and smelted to produce doré gold. In the carbon-in-leach gold processing line, leaching and adsorption are completed in the same tank, giving a more compact flowsheet and fewer tanks. It suits ore with relatively fast leaching kinetics that needs stage control, and is a common route for small-to-large gold processing plants.
A complete gold CIL processing plant includes: crushing → grinding and classification → thickening and pulp conditioning → leaching and adsorption (the CIL core) → loaded carbon desorption and electrowinning → carbon regeneration → gold sludge smelting. Process parameters and CIL equipment configuration at every stage directly determine the final gold recovery and operating cost. The reason carbon-in-leach is so widely adopted in small-to-large plants is that it completes leaching and adsorption in one tank, eliminating a separate adsorption tank train — a short flowsheet, small footprint, controllable investment and tighter operational flexibility than leach-then-adsorb circuits.

Gold CIL processing plant - jaw crusher
Whether a gold CIL processing plant can be delivered on the ground ultimately depends on the process design and equipment manufacturing capability behind it. GoldProcessingPlant is a full-process gold mining service provider integrating process design, engineering design, equipment manufacturing, installation and commissioning, with two self-owned manufacturing bases and technical teams in Shandong and Jiangxi, China.
GoldProcessingPlant strictly follows the ISO9001 quality management system, and its products are CE certified, with an annual production capacity of more than 500 sets. The team consists of gold processing engineers, metallurgical experts, mechanical designers and a project management team, with core members holding 20+ years of industry experience and having participated in multiple large-scale gold EPC projects.
The gold CIL process is matched to ore properties. The following four ore types are typical candidates for carbon-in-leach gold extraction:
Selection note: For ore where gold occurs mainly as free gold, with simple gangue and no interfering elements, the whole-ore cyanidation route is more direct. Sulfide ore, carbonaceous ore, arsenic-bearing ore and finely disseminated ore need a pretreatment assessment first — the gold CIL process cannot be applied directly. When ore properties vary widely, confirm the process route with assay data to avoid misselection.

Gold CIL processing line - cone crusher
The gold CIL process is divided into six stages. Below is a stage-by-stage breakdown of what each operation does, the equipment involved and the control points — the basis for subsequent CIL equipment selection and cost estimation.
The desorption and electrowinning system is key equipment in carbon-in-leach gold extraction. It comes in two configurations, both available from GoldProcessingPlant:

Gold CIL processing plant - ball mill
Stable operation of a gold CIL processing plant depends on precise control of a handful of key parameters. Below are the core control points for carbon-in-leach process design and on-site operation:
Gold CIL parameters are matched to ore properties and target throughput — change the grind size and the leach-adsorption time must follow; raise the slime content and the reagent regime must be re-matched.
The gold CIL processing plant is widely used in small-to-large plants. Its technical advantages concentrate in the following areas:
A note on recovery: Gold recovery in the CIL process is determined by the ore’s inherent characteristics (dissemination size, intergrowth relationships, occurrence state). GoldProcessingPlant does not promise absolute figures detached from reality. What we commit to is this: through rigorous process design, we will design the highest-recovery flowsheet achievable for your ore’s conditions, and pursue excellence in equipment selection and process control.

Gold carbon-in-leach CIL - ambient-temperature atmospheric-pressure desorption and electrowinning system
CIL equipment is configured across six systems by operation. The following is a reference list for a standard carbon-in-leach gold processing line; actual selection must be adjusted to throughput and ore characteristics:
| System | Core Equipment | Function |
|---|---|---|
| Crushing | Jaw crusher, hydraulic cone crusher | Primary + secondary/tertiary crushing; more crushing and less grinding cut grinding energy |
| Grinding | Overflow ball mill, hydrocyclone cluster | Closed-circuit grinding to 85%–95% passing 200 mesh |
| Pretreatment | High-efficiency thickener, trash screen, lime addition system | Condition pulp to 40–45% density and pH to 10.5–11.5 |
| Leaching and adsorption | Dual-impeller leach-adsorption tanks, high-efficiency carbon screens, carbon transfer pumps | Core of the gold CIL process; leaching and adsorption completed in the same tank |
| Desorption and electrowinning | Ambient-temperature atmospheric-pressure desorption and electrowinning system / high-temperature high-pressure desorption column and electrowinning cell train | Strips gold from loaded carbon; gold deposits as sludge. The two systems are chosen by plant scale and ore desorption difficulty |
| Carbon regeneration | Acid wash tank, high-temperature regeneration kiln | Restores barren carbon activity for reuse |
| Smelting | Medium-frequency smelting furnace, gold ingot casting molds | Smelting gold sludge into ingots |
CIL equipment supply note: All the CIL leach-adsorption equipment above is self-manufactured by GoldProcessingPlant, covering the full flow from crushing, grinding, classification, gravity, flotation and cyanidation. Single units or complete sets, configured to ore properties and process requirements — not to inventory. For special conditions (extreme cold, high altitude, severe corrosion, unstable power in Africa), non-standard customization of materials, motor power and structure is available.
In a gold CIL processing plant, core equipment accounts for the bulk of investment. The price of complete main equipment for the carbon-in-leach process is directly tied to throughput. The following ranges are for preliminary investment estimation:
Reference prices for complete main equipment at several common throughput tiers make preliminary comparison easier:
These are reference ranges for complete main equipment only, excluding civil works, installation and logistics. Specific quotations depend on your ore type, process route, throughput, environmental policy and site conditions. Non-standard customization, complex ore, special conditions or more complete configurations will raise the price accordingly. Tell GoldProcessingPlant your daily throughput, ore type and site conditions, and we can directly issue an equipment configuration list and quotation for that throughput, making investment comparison fast.
The main variables affecting gold CIL plant investment include: throughput scale, grind size requirements, number of leach-adsorption tanks and residence time, desorption and electrowinning system selection (ambient or high-temperature high-pressure), carbon regeneration configuration, and civil works and power infrastructure conditions. Two 500 TPD gold CIL processing lines — one on oxide ore, one on arsenic-bearing refractory ore — can differ widely in equipment configuration and investment. A quotation based on actual configuration is the only one worth comparing.

Gold CIL process - leach-adsorption tank train
Gold processing is not short of equipment; what it lacks is a team that understands ore, understands process, understands equipment, and can mesh all three together. On carbon-in-leach gold projects, what sets GoldProcessingPlant apart is:
Every gold CIL process scheme is derived from ore properties, not copied from peer drawings. Quartz vein versus Carlin type, fracture gold versus locked gold — grind size and reagent regime are completely different.
Crushers, ball mills, leach-adsorption tanks and desorption-electrowinning systems are all self-manufactured. Process and mechanical engineers work in the same team, and CIL equipment is built strictly to process drawings — avoiding “drawings and equipment don’t match”.
Is your ore oxide or sulfide, is gold free or locked, how fast does it leach — every equipment selection decision in the gold CIL process has an ore-property basis.
Under EPC, process design, equipment manufacturing, installation guidance and commissioning training are handled by us to the end; civil works and general installation labor are organized locally by the customer, with our engineers providing technical guidance.
Projects cover Africa, South America, Central Asia and Southeast Asia, with capacities of 30–5000 TPD. For unstable power in Africa, we add diesel generator sets; where local worker skill is limited, we train hands-on.
Commissioning and reaching design capacity is only the beginning. We provide systematic training to ensure your team can independently adjust reagent regime, grind size and leaching parameters, and we provide long-term spare parts and process optimization support.
GoldProcessingPlant’s CIL equipment and solutions have been delivered to gold-producing regions across Africa, South America, Central Asia and Southeast Asia, with project capacities from 30 TPD to 5000 TPD and ore types ranging from simple quartz vein to arsenic-bearing and carbonaceous refractory ore.
Complete plant solutions delivered, covering hard rock gold, placer gold and refractory ore, with diesel generator packages for unstable local power.
Multiple hard rock gold plant projects, with capacities from small to large, ore types mainly oxide and sulfide-hosted gold.
Large placer gold plant construction, adapted to extreme cold, with equipment materials and motor power customized for low-temperature environments.
Covering quartz vein and altered rock gold, plus tailings reprocessing projects, with gravity, flotation, cyanidation or combined processes matched to occurrence state.
For your specific ore type and region, GoldProcessingPlant can reference the process approach of similar cases during discussion — but the final scheme is based on your actual ore samples and site conditions, never a copy of another project’s existing drawings.

Gold CIL carbon-in-leach plant equipment installation site
A gold CIL processing plant typically goes through eight stages from ore data to final gold pour. Understanding what happens at each stage and what the customer needs to provide helps with advance planning and avoids detours.
| Stage | Core Work | Customer Cooperation |
|---|---|---|
| Needs communication and preliminary assessment | Understand ore type, grade, throughput, site conditions; preliminary feasibility assessment | Provide basic mine data or assay results |
| Process design and equipment selection quotation | Determine the CIL process route; issue equipment list, selection scheme and budget quotation | Confirm site conditions; provide process and target requirements |
| Scheme confirmation and commercial contract | Confirm flowsheet, equipment, delivery boundary, schedule and responsibility split | Confirm final scheme and budget |
| Engineering drawing design | Plant layout, equipment foundation, arrangement, piping, civil works condition drawings | Confirm site boundary conditions; coordinate with civil contractor |
| Equipment manufacturing and supply | Core equipment production, auxiliary procurement and factory testing | Pay progress payments; advance “three connections and one leveling” and plant foundation |
| Logistics and shipping | Packing, shipping, sea/land transport, documentation and customs clearance, milestone tracking | Provide receiving information; assist customs clearance; arrange unloading and warehousing |
| On-site construction guidance and commissioning | Guide installation, single-machine commissioning, loaded linked trial run | Organize civil works and local installation workers; provide lifting and commissioning conditions |
| Personnel training and after-sales support | Operator training, acceptance handover, spare parts supply, long-term technical support | Arrange operations and maintenance personnel to participate throughout |
A typical gold CIL project takes about 8–15 months from process design to final commissioning. Key milestones: process design 7–15 days → engineering design 20–30 days → equipment manufacturing 60–120 days → logistics 30–60 days → installation and commissioning 60–150 days. Reasonable overlap between stages can compress the total schedule; overseas projects need extra customs clearance buffer.
GoldProcessingPlant provides EPC turnkey service for gold CIL projects: from process design, engineering drawings and core equipment manufacturing to on-site installation guidance, linked commissioning and personnel training, all coordinated by us — the customer deals with one team. But a mineral processing project involves civil works, equipment, installation and commissioning, and different stages have completely different requirements for qualifications, labor cost and site conditions. If “who does what” is not spelled out before the contract is signed, disputes over “waiting for workers” and “passing the buck with extra charges” are almost inevitable later.
So GoldProcessingPlant’s EPC service follows a core principle: what we are responsible for, we see through to the end; what the customer needs to cooperate on, we clarify in advance. The boundary is laid out item by item below.
Why is this division more cost-effective? If we sent a large number of Chinese workers overseas or to another site, the cost of flights, visas, accommodation and high daily wages would be staggering. The customer recruits ordinary installation workers locally, and we provide technical engineers for guidance — saving at least half the labor cost. Local workers also communicate more easily and can flexibly follow the on-site civil works schedule, avoiding delays from waiting for visas or flights.
If the customer genuinely cannot find a construction team locally, or wants GoldProcessingPlant to take on civil works and installation labor as well, this can be discussed separately based on the actual project location, with the scope and cost agreed separately in the contract.

Gold CIL carbon-in-leach plant project site
Beyond the gold CIL process, GoldProcessingPlant’s solution library covers hard rock gold, placer gold, refractory ore and tailings reprocessing, so we can match experience from similar scenarios to your ore type:

Overseas gold CIL plant project site

Gold ore CIL process
On the same leach tank, performance on oxide ore and arsenic-bearing ore can differ widely — the difference lies in whether the leach-adsorption rhythm matches the ore characteristics. The gold CIL process completes leaching and adsorption in the same tank, giving a more compact flowsheet and fewer tanks, but grind size, pulp density, pH and in-tank carbon concentration still need to be matched to ore properties — every link affects final loaded carbon grade and recovery.
GoldProcessingPlant’s logic for gold CIL projects is simple: understand the ore first, then configure the equipment. Tell GoldProcessingPlant your daily throughput, ore type and site conditions, and we can directly issue an equipment configuration list and quotation for that throughput, making investment comparison fast. From ore data to final commissioning, a typical gold CIL processing line takes 8–15 months; single units, complete sets and EPC are available as needed, and the upfront process design fee is deductible in subsequent cooperation.
If you are evaluating the feasibility of a gold CIL processing plant, or your existing CIL plant has recovery that won’t come up or tailings grade that runs high, talk to the GoldProcessingPlant engineering team. Tell us your ore type, throughput and site conditions, and we will match the gold cyanide leaching process route, equipment configuration and investment estimate based on project experience.
GoldProcessingPlant provides customized gold CIL process solutions to gold mining customers worldwide — single equipment, complete sets, engineering drawings, installation and commissioning guidance, and EPC turnkey, combined as needed, with no mandatory bundling.
Contact us and tell us your daily throughput, ore type and site conditions; the GoldProcessingPlant team will issue a configuration quotation with a gold CIL equipment list and budget for you.
GoldProcessingPlant — together with you, to create greater value from every ton of gold ore.
To find out more about our products and solutions, please fill out the form below and one of our experts will get back to you shortly.