The Gold CIP (Carbon-in-Pulp) process is a mainstream gold recovery method that directly uses activated carbon to adsorb and recover gold from cyanide pulp. Why can the same leaching tank achieve vastly different recovery rates when used on oxide ores versus arsenic-bearing ores? The problem often lies not in the equipment, but in whether the gold cyanidation leaching process route and equipment configuration are matched to the ore characteristics. This article breaks down the Carbon-in-Pulp processing line from process principles, core stages, parameter control, equipment configuration, to investment components, helping you clearly see the Gold CIP process route, equipment list, and budget before building or upgrading a plant.
The Carbon-in-Pulp (CIP) method in gold processing is a gold extraction process that directly uses activated carbon to adsorb and recover gold from cyanide pulp. After the pulp completes cyanide leaching, it enters the adsorption tank where activated carbon is added. The gold-cyanide complex is adsorbed and enriched by the carbon. The loaded carbon then undergoes elution, electrowinning, and smelting to produce doré bullion. In the entire Carbon-in-Pulp process, leaching and adsorption are carried out in separate tanks, allowing for more thorough leaching time and a more stable adsorption gradient. It is suitable for ores with fast leaching speeds that require staged control and is a common process for medium to large-scale gold processing plants.
A complete Gold CIP production line includes: crushing → grinding & classification → thickening & conditioning → cyanide leaching → activated carbon counter-current adsorption → loaded carbon elution & electrowinning → carbon regeneration → gold sludge smelting. The process parameters and gold leaching & adsorption equipment configuration at each stage of the Gold CIP process directly determine the final gold recovery rate and operating costs. The reason the CIP Carbon-in-Pulp process is widespread in medium to large plants is that it separates the control of leaching and adsorption. Leaching time can be maximized, the adsorption gradient can be stably maintained, and operational flexibility is greater than processes where leaching and adsorption occur simultaneously.

Gold CIP Processing Line - Jaw Crusher
Whether a Gold CIP processing plant can be realized ultimately depends on the process design and equipment manufacturing capabilities behind it. GoldProcessingPlant is a full-process service provider for gold mining, integrating process design, engineering design, equipment manufacturing, installation, and commissioning. We have two proprietary manufacturing bases and technical teams in Shandong and Jiangxi, China.
GoldProcessingPlant strictly implements the ISO9001 quality management system. Our products are CE certified, with an annual production capacity of over 500 sets. The team consists of gold beneficiation engineers, metallurgical experts, mechanical designers, and a project management team. Core members have over 20 years of industry experience and have participated in multiple large-scale gold mining EPC projects.
The Gold CIP process is not a universal solution; ore properties determine its suitability. The following four types of ore are typical application scenarios for Carbon-in-Pulp processing:
Selection Tip: For ores where gold is mainly in free form, gangue is simple, and no interfering elements are present, the all-slime cyanidation route is more direct. For sulfide ores, carbon-bearing ores, arsenic-bearing ores, and micro-fine encapsulated ores, the necessity of pretreatment must be evaluated first; the Gold CIP process cannot be directly applied. When ore properties vary greatly, it is recommended to confirm the process route based on ore sample data to avoid selection deviations.

Gold CIP Processing Line - Cone Crusher
The Gold CIP process is divided into six stages. Below is a step-by-step breakdown of the function, equipment, and control points of each stage in the Carbon-in-Pulp process, which is also the basis for subsequent Gold CIP equipment selection and investment estimation.
The elution and electrowinning system is key equipment in the Carbon-in-Pulp process. It is divided into two configurations based on operating conditions; GoldProcessingPlant can supply both:

Gold CIP Processing Line - Ball Mill
The stable operation of the Gold CIP plant relies on precise control of several key parameters. Below are the core control points for Carbon-in-Pulp process design and on-site operation:
The parameters of the Gold CIP process are not set in isolation—if the grind size changes, the leaching time must be adjusted accordingly; if the ore mud content increases, the reagent regime must be re-matched. How these parameters are configured depends on your ore properties and target throughput.
The reason the Gold CIP process has become the mainstream choice for medium to large processing plants is that its technical advantages are concentrated in the following aspects:
Note on Recovery Rates: The recovery rate of the Gold CIP process is determined by the ore's inherent genes (dissemination size, intergrowth relationships, occurrence state). GoldProcessingPlant does not promise absolute figures detached from reality. What we promise is: through rigorous process design, we will design the highest recovery process achievable under your ore conditions, and strive for excellence in equipment selection and process control.

Carbon-in-Pulp (CIP) - Atmospheric Elution & Electrowinning System
The equipment configuration of the Gold CIP plant is divided into six major systems according to process stages. Below is a reference for the standard Carbon-in-Pulp configuration. Actual selection needs to be adjusted according to capacity and ore characteristics:
| System | Core Equipment | Function Description |
|---|---|---|
| Crushing | Jaw crusher, hydraulic cone crusher | Primary + secondary/fine crushing, more crushing less grinding to reduce grinding energy consumption |
| Grinding | Overflow ball mill, hydrocyclone cluster | Closed-circuit grinding, controlling fineness to 85%-95% passing -200 mesh |
| Pretreatment | High-efficiency thickener, trash screen, lime addition system | Conditioning to 40-45% concentration, pH adjusted to 10.5-11.5 |
| Leaching & Adsorption | Double-impeller leaching tanks, high-efficiency carbon separation screens, carbon lifters | Core of the Gold CIP process; leaching and counter-current adsorption |
| Elution & Electrowinning | Atmospheric elution & electrowinning system / High-temperature high-pressure elution column, electrowinning cell bank | Gold is desorbed from loaded carbon and deposits as gold sludge; two systems are chosen based on processing scale and ore elution difficulty |
| Carbon Regeneration | Acid washing tank, high-temperature regeneration kiln | Restores activity of barren carbon for recycling |
| Smelting | Medium-frequency smelting furnace, gold ingot casting mold | Gold sludge smelting and casting |
Gold CIP Equipment Supply Note: All the above gold leaching & adsorption equipment is manufactured in-house by GoldProcessingPlant, covering the entire process from crushing, grinding, classification, gravity separation, flotation, to cyanidation. We sell single units or complete sets, configured according to ore characteristics and process requirements, not by inventory. For special working conditions (extreme cold, high altitude, highly corrosive, unstable power in Africa), non-standard customization of materials, motor power, and structure is available.
In the investment for a Gold CIP plant, core equipment accounts for the majority. The price of the complete main equipment set for the Gold CIP process is directly related to processing capacity. Below is an approximate range for preliminary investment estimation:
Reference prices for complete main equipment sets at several common capacity levels are as follows, for preliminary comparison:
The above are only reference ranges for complete main equipment, excluding civil works, installation, and logistics. Specific quotations depend on your ore type, process route, processing capacity, whether a tailings dry stacking system is required, and site conditions. Non-standard customization, complex ores, special working conditions, or more complete configurations will increase prices accordingly. Tell GoldProcessingPlant your daily capacity, ore type, and site conditions, and we can directly issue an equipment configuration list and quotation for the corresponding capacity, making it easy for you to quickly compare investments.
The main variables affecting the investment in a Gold CIP plant include: processing capacity scale, grind size requirements, number of leaching tanks and residence time, elution & electrowinning system selection (atmospheric or high-temperature high-pressure), carbon regeneration configuration, and civil works and power infrastructure conditions. For the same 500 TPD Gold CIP plant, the equipment configuration and investment for oxide ore and arsenic-bearing refractory ore may differ significantly. Only a quotation based on actual configuration has reference value.

Gold CIP Process - Leaching & Adsorption Tank Train
Gold processing is not short of equipment; what it lacks is a team that understands the ore, the process, the equipment, and how to mesh all three together. In Carbon-in-Pulp projects, GoldProcessingPlant stands out in the following ways:
All Gold CIP process schemes are derived based on ore characteristics, not copied from peers' drawings. Quartz vein vs. Carlin-type, fracture gold vs. encapsulated gold—the grind size and reagent regime are completely different.
Crushers, ball mills, leaching tanks, and elution & electrowinning systems are all manufactured in-house. Process and mechanical engineers collaborate in the same team; Gold CIP equipment is manufactured strictly according to process drawings, avoiding "drawings not matching equipment."
Whether your ore is oxide or sulfide, whether gold is free or encapsulated, how fast the leaching speed is—every equipment selection decision in the Gold CIP plant is based on ore characteristics.
Under EPC mode, process design, equipment manufacturing, installation guidance, and commissioning training are managed by us end-to-end; civil works and general installation workers are organized locally by the customer, with our engineers providing technical guidance.
Projects cover Africa, South America, Central Asia, and Southeast Asia, with capacities of 30-5000 TPD. For unstable power in Africa, we equip diesel generators; for limited local worker skills, we provide hands-on training.
Commissioning and reaching design capacity are just the beginning. We provide systematic training to ensure your team can independently adjust the reagent regime, grind size, and leaching parameters, and provide long-term spare parts and process optimization support.
GoldProcessingPlant's Gold CIP equipment and solutions have been delivered to multiple gold mining areas in Africa, South America, Central Asia, and Southeast Asia, with project scales ranging from 30 TPD to 5000 TPD, and ore types from simple quartz vein to arsenic/carbon-bearing refractory ores.
Complete line solution delivery, covering hard rock, placer, and refractory ores; diesel generator solutions provided for local unstable power.
Multiple hard rock gold processing plant projects, with capacities from small to large, ore types mainly oxide and sulfide-hosted gold.
Large-scale placer gold processing plant construction, adapted to extreme cold conditions; equipment materials and motor power customized for low-temperature environments.
Covering quartz vein, altered rock type gold ores, and tailings retreatment projects; matching gravity, flotation, cyanidation, or combined processes according to ore occurrence state.
For your specific ore type and region, GoldProcessingPlant can refer to similar project process ideas during communication—but the final scheme is based on your actual ore samples and site conditions, not copying existing drawings from other projects.

Gold CIP Plant Equipment Installation Site
A Gold CIP plant typically goes through eight stages from ore data to final gold production. Understanding the work content and customer cooperation items at each stage of the Gold CIP process helps with advance planning and avoiding detours.
| Stage | Core Work | Customer Cooperation |
|---|---|---|
| Requirement Communication & Preliminary Assessment | Understand ore type, grade, capacity, site conditions; preliminary feasibility assessment | Provide basic mine data or assay data |
| Process Design & Equipment Selection Quotation | Determine CIP process route; issue equipment list, selection plan, and budget quotation | Confirm site conditions; provide process and indicator requirements |
| Scheme Confirmation & Commercial Contract | Confirm process, equipment, delivery boundaries, schedule, and responsibility division | Confirm final scheme and budget |
| Engineering Drawing Design | Plant layout plan, equipment foundation drawing, layout drawing, pipeline drawing, civil works condition drawing | Confirm site boundary conditions; interface with civil construction contractor |
| Equipment Manufacturing & Supply | Core equipment production, auxiliary equipment quality inspection and procurement, factory test run | Pay progress payments; advance "three connections and one leveling" and plant foundation |
| Logistics & Shipping | Packaging, shipping, sea/land transport, documentation & customs clearance, node tracking | Provide receiving information; cooperate with customs clearance; arrange unloading and warehousing |
| On-Site Construction Guidance & Commissioning | Guide installation, single-machine commissioning, full-load linkage trial run | Organize civil works and local installation workers; provide lifting and commissioning conditions |
| Personnel Training & After-Sales Support | Operation training, acceptance handover, spare parts supply, long-term technical support | Arrange operation and maintenance personnel to participate throughout |
The overall cycle for a conventional Gold CIP project from process design to final production is usually around 8-15 months. Key milestones: process design 7-15 days → engineering design 20-30 days → equipment manufacturing 60-120 days → logistics 30-60 days → installation and commissioning 60-150 days. Reasonable overlapping of stages can compress the total duration; overseas projects need additional buffer for customs clearance.
GoldProcessingPlant provides EPC turnkey services for Gold CIP projects: from process design, engineering drawings, and core equipment manufacturing to on-site installation guidance, linkage commissioning, and personnel training, we coordinate and manage it all. The customer only needs to interface with one team. However, mineral processing engineering involves civil works, equipment, installation, and commissioning. Different stages have completely different requirements for qualifications, labor costs, and site conditions. If "who does what" is not clarified before signing the contract, it is very easy to encounter disputes later such as "stopping work waiting for workers" or "passing the buck and demanding extra money."
Therefore, the core principle of GoldProcessingPlant's EPC service is: what we are responsible for, we manage end-to-end; what the customer needs to cooperate with, we clarify in advance. Here are the boundaries listed item by item.
Why is this division of labor more cost-effective? If we send a large number of Chinese workers to overseas or remote sites for construction, the cost of airfare, visas, accommodation, and high daily wages is extremely staggering. The customer recruits ordinary installation workers locally, and we provide technical engineers for guidance, saving at least half of the labor cost. Moreover, local workers communicate conveniently and adapt more flexibly to the on-site civil works progress, without delaying the schedule due to waiting for visas and flights.
If the customer really cannot find a construction team locally, or hopes that GoldProcessingPlant will also take responsibility for civil works and installation workers, this can be discussed separately based on the actual situation of the project location, with the scope separately agreed in the contract and costs calculated.

Gold CIP Plant Project Site
In addition to the Gold CIP process, GoldProcessingPlant's solution library covers hard rock, placer, refractory ore, and tailings retreatment. We can match experience for similar scenarios based on your ore type:

Overseas Gold CIP Plant Project Site

Gold CIP Process
Returning to the question at the beginning: why can the same leaching tank achieve vastly different recovery rates when used on oxide ores versus arsenic-bearing ores? The answer lies not in the equipment itself, but in whether the Gold CIP process is tailored to the ore characteristics. The core of the Carbon-in-Pulp process is to mesh the parameters of crushing & grinding, leaching & adsorption, elution & electrowinning, and carbon regeneration with the Gold CIP equipment—grind size determines liberation degree, leaching time determines dissolution rate, and adsorption gradient determines loaded carbon grade. Every step is interconnected.
GoldProcessingPlant's logic for Gold CIP projects is straightforward: understand the ore first, then configure equipment. Tell GoldProcessingPlant your daily capacity, ore type, and site conditions, and we can directly issue an equipment configuration list and quotation for the corresponding capacity, making it easy for you to quickly compare investments. From ore data to final production, a conventional Gold CIP production line takes 8-15 months; equipment can be selected as single units, complete sets, or EPC as needed, and the early process design fee can be deducted in subsequent cooperation.
If you are evaluating the feasibility of a Gold CIP plant, or if your existing Gold CIP plant has low recovery and high tailings grade, you are welcome to communicate with the GoldProcessingPlant engineering team. Tell us your ore type, processing capacity, and site conditions, and we will combine project experience to match the gold cyanidation leaching process route, equipment configuration, and investment estimate for you.
GoldProcessingPlant provides customized Gold CIP process solutions for gold mining customers worldwide. Single equipment, complete sets, engineering drawings, installation and commissioning guidance, EPC turnkey—combine as needed, no mandatory bundling.
Contact us and tell us your daily capacity, ore type, and site conditions. The GoldProcessingPlant team will issue a configuration quotation with a Gold CIP equipment list and budget for you.